Estimating and Costing-III - 6th Semester question papers CTEVT( Civil Engineering)

Estimating and Costing-III - 6th  Semester question papers CTEVT( Civil Engineering)

Estimating_and_Costing-III_- 6th_Semester_question_papers_CTEV_(_Civil_Engineering)

Program: Diploma in Civil Engineering  

Year/ Part :III/II (2013)                  

Subject:Highway Engineering II      


Condidates are required to give their answers in their own words as far as practicable. The figures in the margin indicate full marks.

Attemt All Question:

1.Calculate the quantity of earthwork for a portion of a channel from the following data: [16]

Bed width=5m
Free board =45cm
Side slope in cutting =1:1(H:V)
Side slop in banking=1.5:1(H:V)
Fully supply depth=1m
Top width of bank =4m(Left)3m(Right)
Chainage 0 100 200 300 400 500
R.L of GL 101 102.35 100.50 100.80 99.80 99.50
R.L of Bed Slope 98.5 98.4 98.3 98.2 98.10 98.0

2.a) Write detailed specification for supply and fixing of WC pan with cistern. [8]
  b.) Write detailed specification for supply and laying Hume pipes.[8]

3.a) What are the factors affecting cost of suspension bridge.[8]
   b) Write down the goverment procedure to prepare rate analysis of irrigation works.[8]

4.Write shorts notes on:(Any Fours)    [4*4=16]
i) Rapid sand filter   ii) Slab culvert
iii) Suspension bridge  iv) Rural water supply system
v) Estimate of tube well 

5.a) Calculate,the quantities of the following items of a manhole from the drawing given below:[4*4=16]
i) Earthwork in excavation
ii) Cement concrete (1:3:6)
iii) First class brickwork in (1:4) cement mortar
iv) RCC work in slab
                         Good Luck!